6 years ago no Comment

The project involved Design, Installation and commissioning of 500 KVA standby UPS system for Jommo Kenyatta International Airport. Client: Kenya Airports Authority(Subcontract) Status: Completed Scope · Design Of AVS/UPS parallel Power system · Design of Raw power supply system to UPS(Cable sizing and Protection) · Design of Power distribution system from UPS Switch room to […]

6 years ago no Comment

The project involved the supply and commissioning of a remote pumping control system. The system is used to control 2 fresh water pumps that are situated at a river pump house, 3km away from the factory site where the storage tanks are located. Client: Mt. Kenya Bottlers Status: Completed   Scope Supply of intelligent Programmable Logic Controllers with […]

6 years ago no Comment

The project involves the Supply of bottle ejection, ejection conveyors and line control system for London Distillers. Client: London Distillers Limited Status: Phase I completed, Phase II ongoing SCOPE OF WORKS 1.To supply, install and commission a 20000bph bottle rejector systen 2.To supply, install and commission a bottle rejection conveyor 3.To supply, install and commission a control […]

Supply, Installation And Commissioning Automatic Ash Damping System For Two Boilers
6 years ago no Comment

The project involves Supply, Installation And Commissioning Automatic Ash Damping System For Two Boilers Client: Nzoia Sugar Company Status: Completed   SCOPE OF WORKS  ·    To supply, install can commission Pneumatic ash damping systems for boilers 1 and 2   TECHNICAL SPECIFICATIONS   ·    Number  of cylinders:  6 ·    Temperature:   130 degrees · […]

Alvaro Plant Automation For Compliance with Guiness Standards
6 years ago no Comment

The project involves programming, installation and commissioning of a Siemens S7300 PLC system to be used for The chilling Heat Exchanger control. Client: East Africa Breweries Limited Status: Completed Scope ·    Programming of Siemens PLC system and HMI system ·    Installation and commissioning of Pressure Transmitters System Development and programming Programming of system to achieve […]

Supply, Installation and Commissioning of Pre-Payment Meters
6 years ago no Comment

The project involved Supply, Installation and Commissioning of Pre-Payment Meters Client: Kenya Power Status: Completed SCOPE OF WORKS  ·    Provision of installation services for installation and commissioning of active energy meters at low voltage TECHNICAL SPECIFICATIONS  ·    Back to back connection or looped underground service line connection ·    Overhead service line ·    Underground […]

Nzoia Sugar Company: Supply, Installation and Commissioning of Water Hardness Monitoring Equipment
6 years ago no Comment

Supply, Installation And Commissioning Of Water Hardness Monitoring Equipment For The Bioler Water Treatment Plant Client: Nzoia Sugar Company Status: Completed SCOPE OF WORKS  1.   To supply, install and commission water quality monitoring equipment for boiler water 2.   To train operation and maintenance staff on operation and maintenance of the equipment 3.   To provide […]

6 years ago no Comment
6 years ago no Comment
6 years ago no Comment