Design, Installation and Commissioning of UPS Power system for Kenya Airports Authority
The project involved Design, Installation and commissioning of 500 KVA standby UPS system for Jommo Kenyatta International Airport.
Client: Kenya Airports Authority(Subcontract)
Status: Completed
Scope
· Design Of AVS/UPS parallel Power system
· Design of Raw power supply system to UPS(Cable sizing and Protection)
· Design of Power distribution system from UPS Switch room to Terminals within airport
· Installation Of all cabling for power supply to UPS and clean power to Terminals,1,2,3 and International Arrivals
· Commissioning, Testing and Handover of system