Design, Installation and Commissioning of UPS Power system for Kenya Airports Authority

Design, Installation and Commissioning of UPS Power system for Kenya Airports Authority

The project involved Design, Installation and commissioning of 500 KVA standby UPS system for Jommo Kenyatta International Airport.

Client: Kenya Airports Authority(Subcontract)

Status: Completed

Scope

· Design Of AVS/UPS parallel Power system

· Design of Raw power supply system to UPS(Cable sizing and Protection)

· Design of Power distribution system from UPS Switch room to Terminals within airport

· Installation Of all cabling for power supply to UPS and clean power to Terminals,1,2,3 and International Arrivals

· Commissioning, Testing and Handover of system