Design, Installation and Commissioning of UPS Power system for Kenya Airports Authority

The project involved Design, Installation and commissioning of 500 KVA standby UPS system for Jommo Kenyatta International Airport.

Client: Kenya Airports Authority(Subcontract)

Status: Completed

Scope

· Design Of AVS/UPS parallel Power system

· Design of Raw power supply system to UPS(Cable sizing and Protection)

· Design of Power distribution system from UPS Switch room to Terminals within airport

· Installation Of all cabling for power supply to UPS and clean power to Terminals,1,2,3 and International Arrivals

· Commissioning, Testing and Handover of system

Remote Pumping Control System For Cocacola Fresh Water Supply

The project involved the supply and commissioning of a remote pumping control system. The system is used to control 2 fresh water pumps that are situated at a river pump house, 3km away from the factory site where the storage tanks are located.

Client: Mt. Kenya Bottlers

Status: Completed

 

Scope

  • Supply of intelligent Programmable Logic Controllers with local text display
  • Supply of PLC compliant GSM enabled modem system
  • Supply of accessories including relays and wiring termination to the existing pumping system
  • Supply of Panel Enclosures wired with the above components
  • Supply of Level measuring system for fresh water bulk tank

System Development and programming

Programming of system to achieve

  • Remote control of pumping using two PLC’s communicating via SMS
  • Local Pump scheduling system
  • Status updates from pump house via SMS (pump trips, overloads etc)
  • Installation and commissioning

Supply of bottle ejection, ejection conveyors and line control system for London Distillers

The project involves the Supply of bottle ejection, ejection conveyors and line control system for London Distillers.

Client: London Distillers Limited

Status: Phase I completed, Phase II ongoing

SCOPE OF WORKS

1.To supply, install and commission a 20000bph bottle rejector systen

2.To supply, install and commission a bottle rejection conveyor

3.To supply, install and commission a control system for Production line control

4.To train operation and maintenance staff on operation and maintenance of the equipment

 TECHNICAL SPECIFICATIONS

·    Line Speed: 20,000 bottles per hour

·    Material of construction: Stainless steel

Supply, Installation And Commissioning Automatic Ash Damping System For Two Boilers

The project involves Supply, Installation And Commissioning Automatic Ash Damping System For Two Boilers

Client: Nzoia Sugar Company

Status: Completed

 

SCOPE OF WORKS 

·    To supply, install can commission Pneumatic ash damping systems for boilers 1 and 2

 

TECHNICAL SPECIFICATIONS  

·    Number  of cylinders:  6

·    Temperature:   130 degrees

·    Damping:   remote damping via selector switches

Alvaro Plant Automation For Compliance with Guiness Standards

The project involves programming, installation and commissioning of a Siemens S7300 PLC system to be used for The chilling Heat Exchanger control.

Client: East Africa Breweries Limited

Status: Completed

Scope

·    Programming of Siemens PLC system and HMI system

·    Installation and commissioning of Pressure Transmitters

System Development and programming

Programming of system to achieve

·    Differential Pressure monitoring

·    Differential Pressure interlocking

Supply, Installation and Commissioning of Pre-Payment Meters

The project involved Supply, Installation and Commissioning of Pre-Payment Meters

Client: Kenya Power

Status: Completed

SCOPE OF WORKS 

·    Provision of installation services for installation and commissioning of active energy meters at low voltage

TECHNICAL SPECIFICATIONS 

·    Back to back connection or looped underground service line connection

·    Overhead service line

·    Underground service line to individual units connection

·    Apartment/flat with central metering

·    No of meters:4,000

Nzoia Sugar Company: Supply, Installation and Commissioning of Water Hardness Monitoring Equipment

Supply, Installation And Commissioning Of Water Hardness Monitoring Equipment For The Bioler Water Treatment Plant

Client: Nzoia Sugar Company

Status: Completed

SCOPE OF WORKS 

1.   To supply, install and commission water quality monitoring equipment for boiler water

2.   To train operation and maintenance staff on operation and maintenance of the equipment

3.   To provide key strategic spares and consumables, including reagents, to last the machine for at least one year

TECHNICAL SPECIFICATIONS

Units     :           PPM or mg/L

Range   :           At least 0 – 2 PPM

Resolution :           At most 0.1 PPM

Detection   :           CaCo3

Analysis cycle time :           5 minutes maximum